Notes · Cloud and infrastructure
Deployment and scaling
Autoscaling · CI/CD · Rolling, blue-green, and canary deployments
On this page · 7 sections
Overview
Deployment strategies let you ship new versions without downtime and limit the damage of a bad release. Autoscaling adds and removes capacity as traffic changes.
Key concepts
- Rolling update: Replace old instances with new ones a few at a time. The Kubernetes default.
- Recreate: Stop all old Pods, then start new ones. Causes downtime, but two versions never run together.
- Blue-green: Two full environments. Blue serves traffic, Green gets the new version, then traffic switches. Switching back is the rollback.
- Canary: Send a small share of traffic to the new version, compare its errors and latency with the old one, then increase the share. Argo Rollouts and Flagger automate this.
- HPA (Horizontal Pod Autoscaler): Changes the number of Pods to keep a metric near a target. The metric can be CPU or memory use as a percentage of the Pod’s requests, or a custom metric.
- VPA (Vertical Pod Autoscaler): Suggests or sets CPU and memory requests.
- Cluster Autoscaler / Karpenter: Adds a node when Pods are stuck Pending because no node has room for their requests. Removes empty or underused nodes. It looks at requests, not real usage.
- CI/CD: CI builds and tests every change. Continuous delivery keeps every build ready to release. Continuous deployment also releases it automatically.
- Pipeline stages: Build, unit tests, integration tests, end-to-end tests, security scan, deploy. Common tools: GitHub Actions, GitLab CI, Jenkins, Azure Pipelines, Google Cloud Build.
- Pipeline secrets: Keep deploy credentials in the CI tool’s secret store or a vault, or use short-lived OIDC tokens instead of long-lived cloud keys.
Real-world usage
- Risky release: A canary shows the new version to a small slice of traffic first.
- Fast rollback: With blue-green the old version is still running, so rollback is a traffic switch.
- Sales peak: Scale up on a schedule before a known peak, and let metric-based scaling handle the rest.
- Quality gates: Tests, a security scan, and review must pass before deploy.
Tradeoffs
- Blue-green vs. canary: Blue-green is the fastest to switch and roll back but needs double capacity during the cutover. Canary needs less capacity but takes longer and needs good metrics.
- Scaling lag: New Pods take seconds to start, new nodes take minutes. For sudden spikes, scale ahead on a schedule or keep spare capacity.
- Manual approval: Automatic deploys give faster feedback. Regulated industries often require a recorded human approval.
When not to use
- Blue-green for the database: Keeping two large databases in sync is risky. Keep one database and make schema changes backward compatible: add the new column, migrate, then remove the old one later (expand/contract).
- Autoscaling a tiny, steady app: Two servers with flat traffic do not need it.
Interview focus
- Rolling updates: “How does a Kubernetes rolling update work, and what happens to open connections?”
- A new Pod template creates a new ReplicaSet. Kubernetes scales it up and the old one down in steps.
maxSurgeis how many extra Pods are allowed.maxUnavailableis how many may be missing. Both default to 25%.- A new Pod counts only after its readiness probe passes.
- When an old Pod is deleted, two things start at the same time: it is removed from the Service endpoints, and it gets
SIGTERM. Load balancers take a moment to notice, so requests can still arrive after the app stops. - Fix: a short
preStopsleep, then onSIGTERMstop taking new requests, finish the current ones, and exit. - Everything must finish within
terminationGracePeriodSeconds(default 30s). After that the container getsSIGKILL. SIGTERMgoes to PID 1. A shell-formCMD node server.jsruns undersh, which may not pass the signal on. UseCMD ["node", "server.js"]or an init liketini.- WebSockets and other long connections are cut, so clients must reconnect.
- Rollbacks: “How do you roll back automatically?”
- Kubernetes does not roll back by itself. If new Pods never become ready, the rollout just stalls.
- After
progressDeadlineSeconds(default 600s) the Deployment reportsProgressDeadlineExceeded. - Set
maxUnavailable: 0for critical services, so no old Pod is removed before a new one is ready. - The pipeline runs
kubectl rollout status --timeout=...and callskubectl rollout undoif it fails. Helm 3 hashelm upgrade --atomic. - Slow failures, like a memory leak, pass readiness. Catch them with SLO alerts or canary analysis.
- With GitOps, also revert the commit, or the tool reapplies the bad version.
- Scaling signals: “What can you scale on besides CPU?”
- Queue depth or consumer lag, for workers. This is the most direct measure of backlog.
- Requests per second per Pod, for services with steady cost per request.
- Active connections, for WebSocket or connection-limited servers.
- Business events such as orders per minute, when load follows the business.
- Latency, with care. If a shared database is the slow part, more Pods make it worse.
- KEDA reads queues and other event sources, feeds the HPA, and can scale to zero.
kubectl rollout status deployment/<name> -n <namespace>
kubectl rollout history deployment/<name> -n <namespace> # CHANGE-CAUSE comes from the kubernetes.io/change-cause annotation
kubectl rollout undo deployment/<name> -n <namespace> # add --to-revision=<n> for a specific revision
Common mistakes
- No readiness probe: Old Pods are removed before new ones can serve.
- Incompatible versions: During a rollout old and new code run together. New code must not need a column that does not exist yet, and old code must not lose one it reads.
replicasfighting the HPA: A manifest with a fixedreplicasresets the HPA on every deploy. Leavereplicasout when an HPA manages the Deployment.- No upper limit: Set
maxReplicas, node pool limits, and budget alerts so a spike or retry storm does not create a huge bill.
From the notes repository on GitHub, synced Nov 17, 2026.Source ↗ (opens in a new tab)Report a mistake ↗ (opens in a new tab)